Enterprise IT Infrastructure Deployment

Installation, configuration and deployment of network and system infrastructure — LAN, WAN, on-premises data centre and cloud — as a new build or inside an existing estate.

Typical engagementTypically 30 to 180 days depending on the size of the estate and the requirements.

The problem

What usually brings people to this.

  • Unplanned network disruption during change
  • Configuration issues that surface after go-live
  • Scalability constraints in the network infrastructure
  • Integration difficulties with other infrastructure devices and services
What we do

Installation, configuration and handover across LAN, WAN, data centre and cloud

We take a design to a working, documented state. That covers the physical and virtual build, the configuration, the cutover, and the documentation your operations team needs the day after we leave — as-builts and standard operating procedures, not just a completed change ticket.

  • 01

    Network infrastructure deployment

    LAN, WAN and wireless build, configuration and cutover.

  • 02

    Server infrastructure deployment

    Server and compute platform build across on-premises and hosted estates.

  • 03

    Security infrastructure deployment

    Implementation of the hardware, software and network components that protect the estate — firewalls, intrusion detection, encryption and access controls.

  • 04

    Cloud infrastructure deployment

    Deployment and configuration of cloud infrastructure on Azure and AWS.

Methodology

How the engagement runs.

A defined sequence, so you know what is happening at any point and what comes out of each stage.

  1. 01

    Design handover and readiness

    Confirm the design, the prerequisites and the change windows before anything is built.

    • Design review
    • Prerequisites
    • Change windows
  2. 02

    Network infrastructure deployment

    LAN, WAN and wireless build and configuration.

    • LAN
    • WAN
    • Wireless
  3. 03

    Server infrastructure deployment

    Server and compute platform build across on-premises and hosted estates.

    • On-premises
    • Hosted
    • Compute platform
  4. 04

    Security infrastructure deployment

    Implementation of the components that protect the estate.

    • Firewalls
    • IDS / IPS
    • Encryption
    • Access controls
  5. 05

    Cloud infrastructure deployment

    Deployment and configuration of cloud infrastructure.

    • Microsoft Azure
    • AWS
  6. 06

    Cutover

    Planned cutover with validation at each step and a rollback position behind it.

    • Planned cutover
    • Validation
    • Rollback position
  7. 07

    Documentation and handover

    The documentation your operations team needs the day after we leave.

    • As-builts
    • Standard operating procedures
    • Operations handover
Typical duration Typically 30 to 180 days, based on the size of the infrastructure and the requirements.
Deliverables

What you receive.

  • 01High-level design (HLD) and low-level design (LLD)
  • 02As-built documentation
  • 03Standard operating procedures and handover documents
  • 04Long-term design strategy
Outcome

What changes afterwards.

  • A complete refresh of the technology estate where that is the goal
  • Cost optimisation areas identified during the build
  • Technology change that supports the business rather than constraining it

Technologies and frameworks in scope

  • Microsoft Azure
  • AWS
  • LAN / WAN
  • Firewalls & IDS/IPS

Talk to us about enterprise IT infrastructure deployment.

Describe the estate and the constraint you are working within. We will tell you what the engagement would actually involve.

Questions

Before you get in touch.

What's the difference between this and Enterprise IT Infrastructure Design?

Design produces the architecture and plan; deployment is the build — installation, configuration and cutover across LAN, WAN, on-premises data centre and cloud, based on that design.

Do we get documentation we can operate from afterwards?

Yes — as-built documentation and standard operating procedures are part of the deliverables, not just a completed change ticket.

How long does a typical deployment take?

Typically 30 to 180 days, depending on the size of the estate and the requirements.

Does this include security infrastructure, or just network and servers?

All three — network infrastructure deployment, server infrastructure deployment and security infrastructure deployment (firewalls, intrusion detection, encryption and access controls) are covered, alongside cloud infrastructure deployment on Azure and AWS.